East Anglia ONE Offshore Windfarm

UK

SeaRoc Group was awarded a Framework Agreement for the supply of Health, Safety and Quality Services in July 2016.

Key Client Requirements

Supply of skilled and experienced personnel to complement the existing East Anglia ONE project team in the categories of:

  • Health & Safety; and

  • Quality Assurance

SeaRoc Group were required to demonstrate suitable experience from previous projects to show our competence and a management structure to support these secondments and services.

What SeaRoc Group Provided

To date secondments to the project have included:

  • CDM Design Team Coordinator
  • Foundations H&S Engineer
  • Assistant H&S Manager/
    Wind Turbine Package
    H&S Engineer

  • Onshore H&S Advisor/Grid Connection specialist

  • Offshore H&S Rep

In addition we have facilitated independent, unbiased HAZID workshops which were attended by the Client and the respective Contractors and provided follow-up reporting with recommendations on the following project packages:

  • Wind Turbine Installation and commissioning

  • Connection activities required for the Inter Array Cables

  • Foundations Marshalling Port:
      - Site mobilisation and Load in/out of piles
      - Load in/out of Jackets

  • Construction of the O&M Base

SeaRoc provided a facilitator with relevant offshore wind experience, and a Health and Safety professional, to conduct a thorough walkthrough of activities and the approach to hazard analysis.

The workshops brought together representatives from each of the parties, both client and contractor. We then asked questions and provoke “out of the box” thinking about what hazards may arise, and how each contractor interfaces with each other. We took note of the discussions held and produced action lists. A Hazid report was also issued.